The Charities Aid Foundation (CAF), a registered charity in the UK (No. 268369), has provided support for projects in the past and is happy to accept UK tax-effective donations which you can suggest to be used for the Nový Dvůr project. UK tax payers can obtain further information from CAF +44 (0) 1732 520151
For further information email@novydvur.cz
The monastery of Novy Dvur was designed by Mr. John Pawson www.johnpawson.com and his team of collaborators in London. We would especially like to thank Vishwa Kaushal, head of the studio, Pierre Saalburg, head of the project, Ségolène Getti and Stéphane Orsolini for their commitment to this project.
The restoration of the Baroque wing and the technical documentation have been the responsibility of Mr. Jan Soukup and his studio in Plzen www.atelier-soukup.cz, in particular Mr.e Antonín Svehla, engineer, and David Cigler and Ondrej Smetana, draftsmen. We greatly appreciate their professional diligence.
The work of construction has been the responsibility of Starkon Jihlava www.starkon.cz and its numerous subcontractors, a list of whom follows. the company Skanska a.s. has been responsible for the major works of the church, and Berger a.s. for the roadworks. We would like to thank as well Mr. Jiří Kovář, company director, and his collaborators, especially Mr. Stanislav Pik, Mr. Pavol Gencur, Mr. Stanislav Pik, Mr. Jiří Hrdlička, Mr. Jiří Ježek, Mr. Filip Vech, Mr. Oldrich, Flavo Kolarik and their collaborators. Also Mr. Václav Maršík and Mr. Petr Stranský, Josef Lašák, Jan Zvára and Jarmil Svoboda from the office of engineers Bolid-M www.bolid-m.cz, who coordinated the works as a whole.
All have accepted the modesty of our means, which complicated further their work and was also reflected in the level of their remuneration.
The construction of the monastery began in May 2000, with the exception of some preparatory works in 1999. the foundations of the church were laid in the spring of 2001; its construction began in August 2003. We had hoped to complete work on the cloister complex before the Dedication, but a shortage of funds at the beginning of the summer means that parts remain unfinished.
The celebration of the Dedication gives the monks of Novy Dvur the chance to thank their numerous benefactors in the Czech Republic, France, Germany, Belgium, the United States, Italy, Switzerland and Holland, who have supported the construction for five years, as well as the Abbey of Sept-Fons and the many monasteries of the Cistercian Order of the Strict Observance, the monastery of Flavigny and numerous other religious communities. Our thanks go as well to the Foundation of Monasteries, the Ministers of Culture and the Environment in the Czech Republic, the French Minister of Foreign Affairs, Renovabis, Kirche in Not, Serra International, Mutuelle Saint-Christophe Assurances, Bettencourt-Paris Foundations, Raskob Foundation-USA and a number of other organisations. Our thanks go also to those companies who have accorded us exceptional terms: Starkon Jihlava (CZ), Lafarge France, Lafarge Cement, Lafarge Gyps (DE), Lafarge Polska (PL), Saint-Gobain PAM (FR), Alcatel, Ardoisières d'Angers (FR), Arup Acoustics (GB), Attema (NL), Betsinor (FR), Bolid-M (CZ), CEAM Amadeo (I), Česká Spořitelna a.s.,Dornbracht (DE), FSB (DE), Gabotherm (DE), KKH Brno, Glaverbel, Haeffele (DE), Keso (DE), International Conseil Energie (FR), Mazars et Guérard, Peugeot Praha, Ochrana Vod (CZ), Pánské krejčovství Krtička, Povltavské Mlékárny-Bongrain, Sokolovská Uhelná, Starkon Jihlava, Tilo (ÖS), Transports Gondrand, TPS Consult (GB), Weinerberger (DE), Jung (DE), ZČE and to those who have been involved in the work of construction.